Skip to main content
11 November, 2024

MIAX Options Exchange Details Network Refresh for 10G ULL Extranet

11 November, 2024

MIAX Options will upgrade the 10G ULL extranet switches and related network analytics infrastructure beginning in March of 2025. The 10G ULL Extranet upgrade is intended to improve the network’s latency performance and precision of the analytics infrastructure’s timestamp measurements. The upgraded MIAX Options Extranet will be available in parallel with the existing MIAX Options Extranet from March 17, 2025, through April 30, 2025. All firms must establish new Cross Connects (CCs) and migrate their CC usage to the upgraded MIAX Options Extranet by April 30, 2025.